Murdoch University
AICA Engineering was tasked with the opportunity to deliver a complete system solution for an abandoned and incomplete system installation. A comprehensive analysis by our technicians enabled the redesign and the re-structuring of the wiring network, including the rectification aspects of all electrical connections.
The system analysis and optimization carried out by our teams enabled improved efficiency that delivered a smooth commissioning phase and designing layouts of the solar PV Systems installed on the Renewable Energy Department Building in Murdoch University. These systems were a mix of four different 2 kW solar modules that were installed as a practical facility for students. AICA Engineering is happy to report that the system performance is delivering as expected.
AICA Engineering was tasked with the opportunity to deliver a complete system solution for an abandoned and incomplete system installation. A comprehensive analysis by our technicians enabled the redesign and the re-structuring of the wiring network, including the rectification aspects of all electrical connections.
The system analysis and optimization carried out by our teams enabled improved efficiency that delivered a smooth commissioning phase and designing layouts of the solar PV Systems installed on the Renewable Energy Department Building in Murdoch University. These systems were a mix of four different 2 kW solar modules that were installed as a practical facility for students. AICA Engineering is happy to report that the system performance is delivering as expected.